Construction work on a new care home in Sleaford, Lincolnshire is scheduled to finish early, paving the way for the facility to open its doors.
Construction firm, Goldfinch Developments’ first project for the Glenholme Group is on track to hand over six weeks earlier than planned.
Designed by DWA Architects; the £5.2m build on the Glenholme Healthcare site in Sleaford, has 64 beds and the potential for a further 20 assisted living apartments.
Other facilities include a cinema, hairdressing salon, bar and café.
Each bedroom has an en-suite bathroom and a perimeter corridor outside every bedroom offers direct views and access into an extensively-landscaped courtyard.